Runs strictly on its own schedule that cannot change: the kitchen at lunchtime, a machine during the shift, lights in the evening.
The calculator leaves it as is.Flexibility calculator
Estimate in a couple of minutes how much of your site’s load is flexible, how far the peak can drop and what it is worth in roubles.
How much load
can you shift?
Build your site from ready-made equipment or start from a typical one — then adjust power, quantity and hours to match.
Types of load
What matters is how much energy, not when: a boiler heats water at night, a forklift charges before the shift, a pump fills the tank in advance.
Moved to the least loaded hours — usually cheap night hours.Power can be reduced for a while without losing comfort: an air conditioner keeps a margin, ventilation runs quieter, underfloor heating cools slowly.
Reduced by 20% from 8:00 to 22:00.kW — power of one unit (see the label or manual) · pcs — how many units · h/day — how many hours a day it runs
The list is empty — add equipment from the catalogue above.
Take the values from your electricity bill. If you don’t know them, keep the defaults: these are rough figures for Russian price categories 3–4.
- Safetyfewer overloads — less risk of overheated wiring and emergency shutdowns
- Equipment lifewithout simultaneous starts, equipment and cables wear out more slowly and fail less often
- Infrastructureno need to replace cables and transformers or buy a new grid connection
Does your site have optimisation potential?
The answer starts not with a promise of savings, but with equipment, data and power supply conditions.
Free pilot and energy audit for businesses
We’ll review your tariff, load mix and constraints, and define what can be tested in a pilot and how to measure the result.
How the pilot works ↗Pay for energy
in measure
We’ll discuss the task, clarify the inputs and agree on the next step. Message us on Telegram, email or call — no long questionnaires.
Sofia Badamshina, project lead
Discuss a pilot ↗Site type · main equipment · operating schedule · available capacity · tariff, if known · the problem you want to solve.
